Current Affairs & MCQs
Latest Questions, Daily Updates & More

MCQs - 2026-04

Language:
4751.
What is a key focus for the future development of the green hydrogen sector in India?
A Reducing production costs and developing infrastructure
B Phasing out renewable energy sources
C Increasing dependence on imported hydrogen
D Limiting research and development
4752.
The increased green hydrogen production capacity is expected to contribute to:
A Increased reliance on imported fossil fuels
B Enhanced energy security and climate change mitigation
C Higher carbon emissions
D Reduced investment in renewable energy
4753.
What government scheme has been instrumental in driving the growth of green hydrogen production?
A Make in India
B Startup India
C Production Linked Incentive (PLI) scheme
D Ayushman Bharat
4754.
Which of the following sectors is actively exploring green hydrogen as an alternative fuel?
A Textiles
B Information Technology
C Refining, fertilizers, and steel
D Pharmaceuticals
4755.
The National Green Hydrogen Mission aims to make India a global hub for:
A Fossil fuel extraction
B Green hydrogen production and export
C Nuclear energy generation
D Coal mining
4756.
What significant milestone has the National Green Hydrogen Mission achieved as of April 1, 2026?
A Production capacity exceeding 50,000 TPA
B Production capacity exceeding 100,000 TPA
C Achieved carbon neutrality in hydrogen production
D Secured international export contracts for 1 million tonnes
4757.
Which of the following is NOT a stated benefit of the underwater metro project?
A Decongestion of city traffic
B Faster public transport
C Increased air pollution
D Improved quality of life
4758.
The inauguration of the underwater metro is expected to significantly reduce travel time between which two major hubs?
A Kolkata and Howrah
B Delhi and Noida
C Mumbai and Thane
D Chennai and Coimbatore
4759.
What advanced technology was used for constructing the underwater tunnel?
A Conventional drilling methods
B Tunnel Boring Machines (TBMs)
C Explosive blasting
D Open-cut excavation
4760.
Which government agency is primarily responsible for the Kolkata Metro Rail Corporation Limited (KMRCL) project?
A Ministry of Road Transport and Highways
B Ministry of Housing and Urban Affairs
C Ministry of Railways
D Ministry of Finance