MCQs - 2026-03
471.
The underwater tunnel is designed to withstand:
472.
The inauguration of the underwater metro tunnel is expected to boost:
473.
This project is considered a testament to India's growing capabilities in:
474.
What is the approximate length of the underwater section of the tunnel?
475.
The East-West Metro corridor aims to connect which two major areas?
476.
What technology was used for the construction of the underwater tunnel?
477.
What is the primary benefit expected from the new underwater metro tunnel?
478.
The underwater section of the Kolkata Metro plunges beneath which river?
479.
The underwater metro tunnel in Kolkata is part of which metro corridor?
480.
Which city in India has inaugurated its first underwater metro tunnel?